Difference between revisions of "Beacon4"
From Hackstrich
(Finished rough estimates for Layout Proposal A, which comes out ~5m too long to be run by 3 StrichLux driver boxes.) |
(Second layout proposal, closer but still not short enough.) |
||
Line 164: | Line 164: | ||
* Top-Middle Rail: C * 2 = 14ft? | * Top-Middle Rail: C * 2 = 14ft? | ||
* Top Rail Supports: G * 2 = 3ft? | * Top Rail Supports: G * 2 = 3ft? | ||
− | * | + | * Toe Board (double strip): B * 4 = 20ft? |
* '''Total: 214ft? / 65.2m?''' | * '''Total: 214ft? / 65.2m?''' | ||
+ | |||
+ | === Layout Proposal B === | ||
+ | * Vertical Mains: A * 4 * n = 5.083 * 4 * 3 = 61ft | ||
+ | * Beside-Ladder Boxes: (E * 2 + H) * 2 * x = 36ft | ||
+ | * Cross-braces: F * 2 * 2 * x = 7 * 2 * 2 * 2 = 56ft | ||
+ | * Top Rail: B * 2 + C * 2 = 24ft? | ||
+ | * Top-Middle Rail: C * 2 = 14ft? | ||
+ | * Toe Board: B * 4 = 10ft? | ||
+ | * '''Total: 201ft? / 61.3m?''' | ||
= StrichLux Enclosures = | = StrichLux Enclosures = |
Revision as of 15:02, 10 June 2012
Beacon4 will be the fourth incarnation of the flagpole beacon (after Beacon2 and Beacon3), for Burning Man 2012. This year the plan is to take a different approach, and light the entire scaffold tower rather than just a beacon on top of the flagpole.
Contents
Project Status
- 2012-06-07: Work on StrichLux continues. Evaluated lots of software, Lightjams is looking the best at this point, though would require Windows.
- 2012-05-27: Completed rev. 1 StrichLux system design of all modules required for this project and sent all boards off for manufacturing.
- 2012-04-30: Started planning the power architecture for the project.
- 2012-04-29: Work continuing on IO-DMX module.
- 2012-04-24: Permission received!
- 2012-04-23: Requested permission from NeonBunny to attach LEDs to the tower.
- 2012-04-22: Started putting together idea.
Outstanding Issues
- Software evaluation:
- QLC
- Max of only 4 universes, which rules it out
- MagicQ
- Very complex and more geared toward theatre setups than VJ setups
- Supports up to 16 universes over Art-Net
- x86-only
- Advanced features like sound-reactiveness or remote control require a very expensive license dongle
- Lightjams
- x86/Windows-only
- Supports up to 16 universes over Art-Net
- Sound reactiveness, remote control, Wiimote control, and everything else is included for a low price
- QLC
Ideas/Plans
- Main idea is to cover most of the scaffold tower in addressable LED strips, driven by multiple StrichLux modules
- Art-Net will be used between the controller and the StrichLux box
- Fit-PC 2i is being looked at to control the whole thing
- As nice as ARM would be power-wise, x86 will be much more flexible software-wise
- Need to make sure it will be powerful enough before we order
- Need to find a fanless very low power 4 or 5 port Ethernet switch
- Allied Telesis AT-FS705LE V5 might work, it's rugged, low power (1.5-2.5W), and cheap
- But it takes 7.5V which would be another regulator and is a potential point of failure that would bring the entire system down
- Alternative option is the GarrettCom S14H-Hi, it takes 8-15V in via screw terminals and is ruggedized, but $140 and draws 4W
- Best option may be the Sixnet SL-5ES-1, it's $100, rugged, takes 10-30VDC via screw terminals, and only draws 2W
- Allied Telesis AT-FS705LE V5 might work, it's rugged, low power (1.5-2.5W), and cheap
System Components
- Fit-PC 2i (controller)
- 4-port fanless Ethernet switch
- 3 StrichLux boxes (driver, each with:
- Many LED strips (need to work out dimensions)
- Power setup (need to work out power details)
- Debugging terminal (XO-1?)
Power Details
- Power requirements (peak)
- Fit-PC 2i - ???
- Ethernet Switch - ???
- StrichLux box(es) - ???
- LEDs - 10W/m (~1.8A/m at 5V measured, so 10W/m after losses is reasonable)
Power Architecture
http://www.asciiflow.com/#4007824742034929919/13747898[YOB-2] +--------------+ +--->| LED Strip 0 | | +--------------+ | | +--------------+ +---------------+ | +->| LED Strip 1 | +--------------+ | +-+ | +--------------+ | | | StrichLux +---+ | Dome | +->| Controller A +---+ +--------------+ | Lighting | | | +-+ +->| LED Strip 2 | | | | +---------------+ | +--------------+ +--------------+ | | ^ | | +--------------+ | | +--->| LED Strip 3 | +----------+---------+ | +--------------+ | | | | | | +--------------+ | +-+ +--->| LED Strip 4 | | | | +--------------+ | | | | | | +--------------+ | | +---------------+ | +->| LED Strip 5 | +---------------+ | | | +-+ | +--------------+ | | | Distribution | | StrichLux +---+ | Battery +=======>| +--->| Controller B +---+ +--------------+ | | | Box | | +-+ +->| LED Strip 6 | +---------------+ | | +---------------+ | +--------------+ | | | | | | +--------------+ | | +--->| LED Strip 7 | | | +--------------+ | +-+ | | | +--------------+ +--+-------+---------+ | +--->| LED Strip 8 | | | | | +--------------+ +---------+ | | | v v | | +--------------+ +--------------+ +--------------+ | +---------------+ | +->| LED Strip 9 | | | | | | | +-+ | +--------------+ | Convienience | | System | | | StrichLux +---+ | Outlets | | Controller | +->| Controller C +---+ +--------------+ | | | | | | +->| LED Strip 10 | +--------------+ +--------------+ +---------------+ +--------------+
LED Details (out of date, being replaced with below section)
- Length required (very out of date, need to update w/ numbers from Skibit)
- Main vertical bars: 4 * 20ft = 80ft
- Ladder vertical bars: 10 * 3ft = 30ft (but 2 of those are near ground level)
- Rigid guys: 4 * 6ft = 24ft
- Ladder rungs: 8 * 4 * 1.5ft = 36ft
- Total: 170ft (plus probably want a bit extra just in case, so 11 strips or 180ft)
- That's 1760 LEDs and 550W peak!
Lighting Layout
Dimensions
Main Module (2 of these vertically) ----------------------------------- +-----D-----+------E------+ |\ /| | | | | \ / | |-----D-----| | | F / | | H | | \ / | |-----D-----| | | \ / | | | | | / \ | |-----D-----+------E------| | / \ | | | | F \ | A A A / \ A |-----------B-------------+ |/ \| Top Module ---------- | | | | | | | | | | | | | | | | |-------B-----------------| |------------------C------------------| | | | | / \ | | G | |------------------C------------------| | | | | | A============B============A A A | | | |
- A - Module Height (5ft 1in)
- B - Module Width (5ft)
- C - Module Depth (7ft?)
- D - Ladder Width (2.5ft?)
- E - Beside-Ladder Width (B - D) (2.5ft?)
- F - Cross-brace Length (7ft?)
- G - Top Rail Support Height
- H - Ladder Section Height (4ft?)
- n - Number of Modules (3)
- x - Number of Main Modules (2)
(note: F and C can't possibly be the same as they are now!)
Layout Proposal A
- Vertical Mains: A * 4 * n = 5.083 * 4 * 3 = 61ft
- Beside-Ladder Boxes: (E * 2 + H) * 2 * x = 36ft
- Cross-braces: F * 2 * 2 * x = 7 * 2 * 2 * 2 = 56ft
- Top Rail: B * 2 + C * 2 = 24ft?
- Top-Middle Rail: C * 2 = 14ft?
- Top Rail Supports: G * 2 = 3ft?
- Toe Board (double strip): B * 4 = 20ft?
- Total: 214ft? / 65.2m?
Layout Proposal B
- Vertical Mains: A * 4 * n = 5.083 * 4 * 3 = 61ft
- Beside-Ladder Boxes: (E * 2 + H) * 2 * x = 36ft
- Cross-braces: F * 2 * 2 * x = 7 * 2 * 2 * 2 = 56ft
- Top Rail: B * 2 + C * 2 = 24ft?
- Top-Middle Rail: C * 2 = 14ft?
- Toe Board: B * 4 = 10ft?
- Total: 201ft? / 61.3m?
StrichLux Enclosures
- Each StrichLux controller with its 4 output modules, 1 input module, and 1 power module will need an enclosure of some kind.
- Pelican case? Could do one larger one with all 3 controllers in it, or 3 smaller ones
- Assuming each StrichLux box has its own enclosure, would need a bunch of connections made through it:
- Power - 2x12V @ 20A each - 4 20A power pins
- Ethernet input - RJ45 - 1 RJ45
- Connec has plastic bayonet-style IP67 industrial Ethernet connectors which are somewhat reasonably priced, so far this looks like the best option even though it is a lot more expensive than regular non-weatherproof Ethernet
- Strip outputs - SPI+5V - 2 signal pins, 2 10A power pins each x 4
- JAE SRCN2A16-7S / SRCN6A16-7P would be good and extremely rugged, but the cost may be too high
- Need inter-strip connectors too
- Molex MX150 or Amphenol ATP connectors look good, sealed high-current automotive connectors that aren't too expensive
Test Equipment
- Want to be able to power the whole setup from AC power for configuration/testing/programming
- ATX power supplies provide plenty of +12V which could feed the PWR-DC5 modules
- A modular supply like the OCX ZT-series would be cleanest, could modify the cables with Sabre connectors on the ends
- Need 100W per channel, 200W per board, 600W total @ 12V
- 100W per channel @ 12V means 8.33A
- PCI-E and 8-pin CPU power connectors on ATX PSUs provide 6 amps per pin
- PCI-E connectors have 3 pin pairs each
- 8-pin CPU power connectors have 4 pin pairs each
- Need four pins per board
- Two boards get 8-pin CPU power -> Sabre connectors
- The last board gets a 2xPCI-E power -> Sabre connector
- OCZ ZT-series 750W power supply has all the required connectors
- ATX power supplies provide plenty of +12V which could feed the PWR-DC5 modules