Difference between revisions of "Project Dandelion/Work Log"

From Hackstrich
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
<b>2010-04-02</b>: Photographed whole chassis before removing/disconnecting any parts.  Cleaned out all loose paper/foam/etc.  Started identifying major components and what the purpose of each is.
+
== 2010-04-02 ==
 +
* Photographed whole chassis before removing/disconnecting any parts.  Cleaned out all loose paper/foam/etc.  Started identifying major components and what the purpose of each is. Photos available in [http://sarahemm.net/gallery/v/projects/dandelion/initial_internal/ Initial Internal Photos gallery].
 +
* Removed and wirebrushed card cage fan retention bracket.
 +
* Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it.
 +
 
 +
== 2010-04-04 ==
 +
* Did a lot of wiring harness tracing, added to schematic.  Removed any wiring that could be removed once it was traced/documented.  Took photos of all wire routing (not yet uploaded) so that I can hopefully re-route it the same once it goes back in.
 +
* Removed maintenance panel board for reverse-engineering.
 +
 
 +
== 2015-05-23 ==
 +
* Started a separate log for this - [http://dandelion.sen.cx sen's Xerox Star 8010 Restoration Log]
 +
 
  
 
[[Category:Project Dandelion]]
 
[[Category:Project Dandelion]]

Latest revision as of 01:02, 24 May 2015

2010-04-02

  • Photographed whole chassis before removing/disconnecting any parts. Cleaned out all loose paper/foam/etc. Started identifying major components and what the purpose of each is. Photos available in Initial Internal Photos gallery.
  • Removed and wirebrushed card cage fan retention bracket.
  • Reverse engineered a schematic for the power distribution board and created an EAGLE schematic for it.

2010-04-04

  • Did a lot of wiring harness tracing, added to schematic. Removed any wiring that could be removed once it was traced/documented. Took photos of all wire routing (not yet uploaded) so that I can hopefully re-route it the same once it goes back in.
  • Removed maintenance panel board for reverse-engineering.

2015-05-23