Search results
From Hackstrich
Create the page "Time" on this wiki! See also the search results found.
- ...be made of mostly off-the-shelf parts plugged together, as I have limited time to get it put together. ...to each strip, to save power when nothing is displayed and during the day time2 KB (325 words) - 20:32, 18 April 2024
- ...alling this completed, Rev3 boards are working and have been sold for some time, if I get around to building the integrated version I'll start it as a new ...to Waiting for Time. Rev 2 boards did not arrive (postal system fail) in time, so rev. 3 will be designed and sent out for production boards, without hav5 KB (916 words) - 15:04, 1 March 2017
- * Lasts a long time on a CR2032 or similar4 KB (685 words) - 17:38, 30 March 2018
- * It may take too much CPU time/code (especially on small CPUs) to keep up with the BlinkieNet (on a large * Will forwarding BlinkieNet packets through every node in the matrix be too time-consuming for decent frame rates? If so, do we need to connect the whole m6 KB (933 words) - 03:28, 25 November 2012
- ...information from a whole network of BlinkieBits, rather than just one at a time.7 KB (1,111 words) - 20:47, 27 December 2011
- ...nch more, now keeps (sort of, it starts at a fixed point and can't be set) time! Numeric display still getting corrupted for 1-2 seconds randomly, need to ...k up to make this, failed to find anything nice looking that supported 24h time. The [http://incolor.inebraska.com/bill_r/hayes_stack_chronograph.htm Hayes12 KB (2,000 words) - 02:07, 12 January 2019
- |Real Time Clock frequency reference - 120V side |Real Time Clock frequency reference - 12V side642 bytes (108 words) - 13:25, 4 April 2010
- ...status, as I won't have time until after Burning Man as I'm putting all my time into [[Beacon4]]. * 2012-04: Boards are here, awaiting time to test.2 KB (389 words) - 14:15, 2 June 2013
- * Charging chip did not arrive in time, so the charge controller was bypassed and the solar cell connected straigh ...ogram 0 should run for less time. No more than 5 seconds at a time. Blank time makes it too hard to locate the beacon.8 KB (1,359 words) - 19:00, 11 August 2011
- ....pde#L153 Program 0] should run for less time. No more than 5 seconds at a time. ...tra-board comms would work (as long as the ATwhatever has both at the same time supported)2 KB (403 words) - 13:01, 19 July 2011
- ...main in a 'halt state' until the UVLO threshold has been reached, at which time it will connect VEE to RTN (via an internal power MOSFET) which will start15 KB (2,569 words) - 04:57, 26 December 2012
- ...or has been working fine for now. System works great and saves us a lot of time! ...tSpark board successfully. System worked great and saved a huge amount of time. Still need to get the small tank working and find the bezel for the back2 KB (303 words) - 19:19, 10 November 2013
- === Waiting for Free Time === |category=Status/Waiting for Time1,003 bytes (131 words) - 11:03, 19 October 2010
- * 2011-10-21: Brought up board and programmed it for the first time, found issue with TFT FPC connector (worked around) and backlight driver (w7 KB (1,143 words) - 16:57, 29 January 2012
- HackTrack is going to be a system to keep track of who's been spending time cleaning the lab ([http://www.hacklab.to HackLab.TO]) and award points and ** Will do one more test next time, then counterbore the final panel3 KB (550 words) - 15:05, 1 March 2017
- ...(less?) pole for Burning Man 2011. It will be simpler than [[Beacon2]] as time is limited to get it done, but we want a brighter beacon. ...not 2 as I thought). Wrote "health check" code (run each emitter one at a time at 200mA, checking the status register while it's on to see if there are an8 KB (1,253 words) - 03:26, 25 November 2012
- * 2011-10-18: First board assembled, but no time to test today.2 KB (356 words) - 03:01, 30 January 2012
- ...em right. Ran out of time after this point, need to pick back up here next time. Wrote a quick 'tilegradient' tool to generate a 0-255 gradient for trouble3 KB (522 words) - 15:15, 28 March 2021
- ** 1x JT remote will have jam start/stop button and a time/status display in case the operator can't see the scoreboard2 KB (321 words) - 14:50, 13 June 2016
- ...ant to put a proper gel over the displays but it looks pretty good for the time being as-is. Done other than that!5 KB (846 words) - 01:08, 10 April 2015