  • === Currently Active Projects === |category=Current Projects
    734 bytes (78 words) - 14:43, 21 March 2024
  • * 2017-02: Calling this completed, Rev3 boards are working and have been sold for some time, if I get around * 2013-02: Putting on hold for now, too many other projects on the go.
    5 KB (916 words) - 15:04, 1 March 2017
  • * 2017-12-13: Completed PCB design, sent to OSH Park for manufacturing. ** I almost never have projects that don't involve firmware, I'd like this to be one of them.
    4 KB (685 words) - 17:38, 30 March 2018
  • [[Category:Completed Projects]]
    7 KB (1,111 words) - 20:47, 27 December 2011
  • * 2017-10-30: Completed the Base board and checklisted it. * 2017-10-22: Completed and checklisted the board layout for the Display board. 24h waiting period
    12 KB (2,000 words) - 02:07, 12 January 2019
  • * 2013-05: Going to call this completed after all, decided against offering it as a product as I don't think there' * 2011-09-30: Completed routing board, added all required silkscreen, submitted to Laen for prototy
    2 KB (389 words) - 14:15, 2 June 2013
  • Beacon completed and used at Burning Man 2010! :) Successor project for Burning Man 2011 is [[Category:Completed Projects]]
    8 KB (1,359 words) - 19:00, 11 August 2011
  • [[Category:Completed Projects]]
    2 KB (303 words) - 19:19, 10 November 2013
  • * 2012-01-29: Too many projects on the go, this one's getting put into dormant state for now. * 2011-09-21: Added speaker and completed the rest of the routing. Added silkscreen to all connectors/test points/bu
    7 KB (1,143 words) - 16:57, 29 January 2012
  • ** 8 big toggle switches to identify which tasks you have completed [[Category:Cancelled Projects]]
    3 KB (550 words) - 15:05, 1 March 2017
  • [[Category:Completed Projects]]
    1 KB (172 words) - 03:45, 23 September 2011
  • ** <s>'''Target completion date - 2011-03-18'''</s> - Completed 2011-03-18 ** <s>'''Target completion date - 2011-03-21'''</s> - Completed 2011-03-20
    4 KB (576 words) - 03:33, 29 June 2011
  • [[Category:Completed Projects]]
    722 bytes (111 words) - 00:56, 5 September 2023
  • * 2011-07-23: Schematic for LED driver board started and almost completed. * 2011-07-24: Board layout for LED driver board completed pending final review.
    8 KB (1,253 words) - 03:26, 25 November 2012
  • * 2012-01-22: Ordered connectors from 4U. Completed all documentation and final library code, set up a github project for it an * 2011-09-18: Completed/tagged rev. 1 and submitted to Laen.
    2 KB (356 words) - 03:01, 30 January 2012
  • * 2012-03-06: Completed routing, still need to do a final look-over and checklist before CAMing. ...to assist in troubleshooting, and test points for each side of the HVAC. Completed adding silkscreen and ran checklist, CAM files now sent to Laen for manufac
    3 KB (522 words) - 04:53, 26 December 2012
  • * 2015-09-13: Completed silkscreen/CAM/checklisting. Sent to OSH Park for manufacturing. [[Category:Dormant Projects]]
    837 bytes (135 words) - 14:04, 13 November 2017
  • [https://vine.co/v/MvhltXD5Win Video of completed/mounted display operating] [[Category:Completed Projects]]
    5 KB (846 words) - 01:08, 10 April 2015
  • * 2012-02-26: Completed PCB layout and CAM, sent off to Laen for manufacturing. Transformer sample * 2012-02-25: Completed design and simulation runs, started schematic entry and BOM creation.
    4 KB (742 words) - 04:53, 26 December 2012
  • * 2013-05: On hold for how due to too many other paying/deadlined projects. Will resume when working on [[invisibleMaze]]. * 2012-08: Completed testing, now works with all 4 output channels. Used at BRC2012 for [[Beaco
    8 KB (1,178 words) - 06:46, 30 December 2014
  • * 2014-06-29: Completed routing TX PCB and checklisted it. Started designing the RX. [[Category:Dormant Projects]]
    2 KB (252 words) - 18:28, 12 September 2015
  • * 2013-11-18: Completed design for the laser node board, ordered 12 (3 sets) from OSH Park. * 2012-09-17: Completed schematic and board layout for the Hub LED board. Will submit it with the
    9 KB (1,456 words) - 14:39, 3 November 2014
  • * 2013-05: On hold for how due to too many other paying/deadlined projects. Will resume when working on [[invisibleMaze]]. * 2012-05-07: Ran checklist, completed last few changes. Rev. 1 schematic complete, board layout started (but stu
    4 KB (560 words) - 03:23, 21 September 2013
  • * 2013-05: On hold for how due to too many other paying/deadlined projects. Will resume when working on [[invisibleMaze]]. * 2012-05-25: Completed layout, need to do final checklist run before sending off.
    2 KB (272 words) - 23:18, 20 May 2013
  • *2012-05-27: Completed rev. 1 [[StrichLux]] system design of all modules required for this project [[Category:Completed Projects]]
    33 KB (4,431 words) - 00:23, 27 September 2013
  • * 2013-05: On hold for how due to too many other paying/deadlined projects. Will resume when working on [[invisibleMaze]]. * 2012-08: Completed building 12 revision 2 boards, which worked exactly as expected. Ran them
    4 KB (630 words) - 00:56, 5 September 2023
  • ...uct this relies on never made it to market, so I'm calling this project as completed as it's going to get. It successfully routes data between ports, which was * 2013-10-08 - Board completed and checklisted.
    6 KB (988 words) - 17:07, 22 April 2017
  • * 2015-05-25: Completed Rev002 layout, pending final review. * 2015-03-15: Completed routing board, silkscreen and checklist run done. Waiting 24h for final rev
    8 KB (1,421 words) - 14:06, 13 November 2017
  • ...d, successfully using it to test [[StrichLux/IO-DMX]]. Going to call this completed, as there's not much that could need changing. * 2012-03-17: Completed design, BOM, schematic, board layout, and CAM. Submitted rev. 1 board to L
    746 bytes (114 words) - 04:30, 21 April 2012
  • * 2012-01: PCB design completed and sent off. [[Category:Dormant Projects]]
    1 KB (219 words) - 05:08, 9 September 2012
  • * 2013-07-06: Completed hardware check-out, only a couple minor issues and one (optional unless deb * 2013-06-25: Completed mechanical design, PCB submitted to MyRO.
    6 KB (905 words) - 02:43, 14 June 2015
  • * 2014-10-15: Marking completed, firmware could use some finishing touches at some point but other than tha * 2013-03-31: Completed Rev002 respin, all 17 identified issues with Rev001 are fixed. Checklists
    5 KB (937 words) - 13:31, 15 October 2014
  • * 2014-11-09: Completed BOM and schematic, and completed board layout except for the checklist. Will checklist/CAM it tomorrow. [[Category:Completed Projects]]
    995 bytes (142 words) - 18:45, 12 September 2015
  • * 2017-11: Has been running for a long time, calling this completed. Would like to clean up the firmware/make it more configurable at some poin * 2014-12-07: More routing completed.
    2 KB (307 words) - 14:10, 13 November 2017
  • * 2014-12-14: Completed routing board, needs silk and checklisting still. * 2014-12-12: Completed and checklisted schematic, started routing board
    2 KB (246 words) - 18:27, 13 September 2015
  • * 2016-09-06: Completed checklist and CAM, sent quote request to Hackvana as this will be >$200 jus * 2016-08-22: Completed routing board, need to do silk and checklist.
    2 KB (358 words) - 02:07, 2 May 2022
  • [[Category:Completed Projects]]
    2 KB (362 words) - 00:14, 26 February 2017
  • ...erarchical menu structure using SerialUI rather than single-byte commands. Completed hardware for RTC and added ability to set/read clock from the debug subsyst * 2017-04-05: Completed all laser cut part design files and added amount of material needed for eac
    6 KB (978 words) - 14:05, 13 November 2017
  • * 2017-03-03: Completed checklisting, board sent to OSH Park w/ expedited shipping option, should h * 2017-01-30: Completed schematic/BOM/board layout.
    1 KB (204 words) - 14:06, 13 November 2017
  • ** I wanted to get the system completed and in use quickly, rather than having to iterate on a hardware design befo I ended up working on the Alert sign first once the gem was mostly completed, as it seemed the most straightforward. This sign pulls data from the openH
    19 KB (3,277 words) - 21:00, 24 October 2020
  • * 2023-09-24: Completed silkscreen and ran through an initial checklisting, want to take a close lo * 2023-09-23: Completed routing the board over the past week, still need to finish silkscreen and r
    7 KB (1,275 words) - 14:41, 21 March 2024